Skip to main content
See every side of every news story
Published loading...Updated

The Sectors of Greater Santo Domingo that Will Be Affected by a Broken Pipeline on the Duarte Highway

A breakdown in the 30-inch pipeline of the Valdesia-Isamana system, located on the Duarte Highway side of the road in the La Venta sector, has left several areas of Santo Domingo Oeste and the northern part of the National District without drinking water service. The Santo Domingo Water and Sewer Corporation (CAASD) reported that crews are working to repair the pipeline, which gave way during the construction of the Metro station at kilometer 9 …
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

3 Articles

The Corporación del Aqueducto y Alcantarillado de Santo Domingo (CAASD) reported that the drinking water service is partially interrupted in several sectors of Santo Domingo Oeste, due to a breakdown caused by excavations linked to the construction work of the Santo Domingo Metro. According to the institution, technical brigades of the Operations Directorate are working on the correction of the break, located in the marginal of the Duarte Highwa…

The rupture in an underground pipeline located in the construction area of the Metro, at the height of kilometer 9 of the Duarte highway, has caused great flooding in front of a gas plant, generating chaos in the vehicle traffic and concern among residents of the area. (Continue reading...) The entrance Break of pipe under the beams of the Metro causes flooding was first published in Remolacha - News Dominican Republic.

A breakdown in the 30-inch pipeline of the Valdesia-Isamana system, located on the Duarte Highway side of the road in the La Venta sector, has left several areas of Santo Domingo Oeste and the northern part of the National District without drinking water service. The Santo Domingo Water and Sewer Corporation (CAASD) reported that crews are working to repair the pipeline, which gave way during the construction of the Metro station at kilometer 9 …

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

www.diariolibre.com broke the news in on Wednesday, August 20, 2025.
Sources are mostly out of (0)

Similar News Topics

News
For You
Search
BlindspotLocal