The railway bridge can move from Prague's Výtona to Modřany
5 Articles
5 Articles
If the railway bridge on the Výton is replaced by a new structure, it will be moved to a place near the Modřan weir, where it will serve as a footbridge for pedestrians and cyclists. Prague councilors decided on the choice of location on Monday based on a study of possible locations prepared by the Institute of Planning and Development (IPR). The Railway Administration (SŽ) plans to replace the bridge, which is in poor condition, with a new one,…
The railway bridge on Výtoni, if replaced by a new structure, will move to a place near the Modřany weir, where it will serve as a footbridge for pedestrians and cyclists. On the basis of a study of possible locations, the Council of Prague decided on the choice of the location. The railway administration plans to replace the bridge, which is in poor condition, with a new one. This is criticized by conservationists, associations and local town h…
The railway bridge on Výtoni, if replaced by a new structure, will move to a place near the Modřany weir, where it will serve as a footbridge for pedestrians and cyclists. On the basis of a study of possible locations prepared by the Institute of Planning and Development (IPR), the Prague councillors decided on Monday. The Railway Administration (SŽ) plans to replace the bridge, which is in poor condition, with a new one, which has been criticiz…
On Monday, the Prague councilors approved the relocation of the bridge structure of the railway bridge upstream of the Vltava to the Modřánský weir, if it is not possible to keep the bridge in its current position. It should serve as a footbridge for pedestrians and cyclists.
Prague - The railway bridge on Výtoni, if replaced by a new structure, will move to a place near the Modřany weir, where it will serve as a footbridge for pedestrians and cyclists. On the basis of a study of possible locations prepared by the Institute of Planning and Development (IPR), the Prague councillors decided on the choice of the site today. The Railway Administration (SŽ) plans to replace the bridge, which is in poor condition, with a n…
Coverage Details
Bias Distribution
- 100% of the sources lean Left
Factuality
To view factuality data please Upgrade to Premium



