After Two Months of Work, All the Branches of the Mitre Train Return to the Retiro Station
5 Articles
5 Articles
It will be from this Thursday, after completion of the tests with the new signalling system.The works had started on January 10.
The restoration reaches Tigre, José León Suárez and Bartolomé Mitre branches. The works included new traffic lights, cables and renewal of roads to improve safety and reduce travel times.
Buenos Aires, 11 March (NA) — The service of the line Mitre Line will return to operate normally from this Thursday 12 March and the formations will resume their arrival and departure from the station Retiro Station (Mitre), after being more than a week with limited travel by works and evidence of marking, besides being two months without operation. According to the Argentine News Agency, after the approval of the new cabin Maldonado, the branch…
Argentine trains reported that from tomorrow morning the electricity services of the Mitre line will circulate again until Retiro. The restoration of the services, originally planned for March 1, was rescheduled several times. Criticisms for the prolonged suspension and proximity of the festival Lolapalooza motivated the advance of the reopening.
Argentine trains reported that, from tomorrow, March 12, the services of the Tigre, J. L. Suárez and Bartolomé Mitre branches will return to Retiro, after the completion of the operational tests of the renewed signalling system. The restoration of the service takes place after the tests of rigor, which were carried out in less time than expected and gave satisfactory results, allowing to guarantee the optimal conditions of circulation. The tests…
Coverage Details
Bias Distribution
- 100% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium



