Published 4 years ago • loading... • Updated 4 years ago
Definitive shutdown of the nuclear cemetery in Villar de Cañas as “unfeasible”, the seven power plants will store the waste
Summary by Público
2 Articles
2 Articles
Definitive shutdown of the nuclear cemetery in Villar de Cañas as “unfeasible”, the seven power plants will store the waste
After analyzing the allegations, the Ministry considers this because it has not reached “the necessary degree of consensus” and opts for the second option of the 7th General Plan for Radioactive Waste.
The Government considers the Villar de Cañas nuclear warehouse “unfeasible” and orders one to be built in each power plant
The latest version of the Waste Plan rules out the construction of the Villar de Cañas nuclear warehouse and mandates the construction of seven ATDs, one per plant.
Coverage Details
Total News Sources2
Leaning Left1Leaning Right0Center0Last Updated100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium

