Energy Plan for Winter: Cernavode Approaches 20% of Production Again and Gas Stocks Have Reached 85% Share in Deposits
4 Articles
4 Articles
The Cernavod nuclear power plant operates in parameters, as a result of the increase in the Danube's water flow, covering 20% of the energy production requirement, and gas stocks have reached the 85% share in deposits, announced Wednesday, Government spokesman Dan Carbunaru.
Government spokesman Dan Cárbunaru announced on Wednesday that we have an increase in the Danube water flow, which supports the operation of Units 1 and 2 at Cernavoda, which complements the need for energy production, covering almost 20% of it, He also said that, by the end of the year, Romania will have a storage capacity of 2000 MW of electricity.
Cernavod nuclear power station works in parameters, as a result of the increase in the Danube's water flow, covering 20% of [...]
The government discussed on Wednesday the energy solutions with which Romania will pass the cold season. The government spokesman says that CNE Cernavoda will be able to reach, again, 20% of the total energy mix, and the gas will also play an important role.
Coverage Details
Bias Distribution
- 50% of the sources lean Left, 50% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium





