The work at the A1 connection point Hamm-Bockum/Werne goes into the next phase. For the demolition of the second bridge building via Nordlippestraße (L518), the road must be completely closed from Friday (31 July) at 8 pm to Monday ( 3 August) at 4 am. As the Autobahn GmbH informs, the demolition is a prerequisite for the new building of the second partial bridge. The directional runways of the A1 run at this point over two separate bridge const…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The work at the A1 connection point Hamm-Bockum/Werne goes into the next phase. For the demolition of the second bridge building via Nordlippestraße (L518), the road must be completely closed from Friday (31 July) at 8 pm to Monday ( 3 August) at 4 am. As the Autobahn GmbH informs, the demolition is a prerequisite for the new building of the second partial bridge. The directional runways of the A1 run at this point over two separate bridge const…