TAQA Completes Third Phase of UAEU Solar Project, Powering 30% of Campus with Clean Energy
2 Articles
2 Articles
TAQA Completes Third Phase of UAEU Solar Project, Powering 30% of Campus with Clean Energy
TAQA Energy Services, a subsidiary of the Abu Dhabi National Energy Company (TAQA), has successfully completed the third phase of a major 9,000-kilowatt peak (kWp) solar photovoltaic (PV) project at […] The post TAQA Completes Third Phase of UAEU Solar Project, Powering 30% of Campus with Clean Energy appeared first on SolarQuarter.
TAQA Energy Services and UAE University complete UAE’s largest education sector solar project | CXO Insight Middle East
TAQA Energy Services, a subsidiary of the Abu Dhabi National Energy Company (TAQA), announced the completion of the third phase of the 9000-kilowatt peak (kWp) solar photovoltaic (PV) project at United Arab Emirates University’s (UAEU) campus. The 14,400 advanced solar panels, strategically installed across 84,000 square meters, can generate 18.7 million kilowatt-hours (kWh) of renewable energy annually, supplying 30% of the university’s electri…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium