Skip to main content
See every side of every news story
Published • loading... • Updated

Svolt Starts Mass Production of 100-kWh Semi-Solid EV Batteries

The 100-kWh pack supports 6C charging and can add 500 kilometers of range in 12 minutes, Svolt said.

  • Svolt Energy began mass production of 100-kWh "Dragon Armor" semi-solid battery packs on October 26 at a facility in Changzhou, Jiangsu province, advancing commercialization of the hybrid technology.
  • While most industry developers view semi-solid batteries as a temporary bridge to fully solid-state technology, Svolt maintains these hybrid cells will remain a core, permanent option for electric vehicles for years to come.
  • Built on a 900-volt architecture, the pack supports extreme 6C charging and adds 500 kilometers of range in 12 minutes; the design reportedly delivers over 3,000 charging cycles, translating to a lifetime exceeding 1 million kilometers.
  • The pack features six layers of underbody armor, reportedly providing three times the impact resistance required by national standards; CEO Yang Hongxin stated that further details will be revealed soon.
  • Growing 39.3% year-on-year, Svolt holds a 2.6% global EV battery market share, while competitors like WeLion supply ultra-high-density packs for luxury EVs at premium prices, contrasting Svolt's immediate price-parity strategy.
Insights by Ground AI

12 Articles

China's manufacturer Svolt has just taken an important step in the development of semi-solid batteries. Its first packs of... The 500 km article recovered in 12 minutes: this new generation of battery enters production, but for which models ? appeared first on Automobile Clean.

Svolt is mass producing a 100 kWh 900V semi-solid state battery that it claims can add 500 km of range in 12 minutes. |The Dragon Armor battery supports 6C charging, has a theoretical lifespan of over 1 million km, and features six layers of protection. |Svolt has not yet announced the vehicles that will use the battery.

·Indonesia
Read Full Article

The Chinese company Svolt announces the start of production of its new semi-solid battery for electric cars. With a capacity of 100 kWh, it recovers 500 kilometers of autonomy in 12 minutes and promises to hold more than one million kilometers.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

se7en.ws broke the news on Monday, October 26, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal