Published • loading... • Updated
Stelpe Solar Farm Reaches 145 MW Full Commercial Operation, Strengthening Grid With Clean Power
Summary by solarquarter.com
1 Articles
1 Articles
Stelpe Solar Farm Reaches 145 MW Full Commercial Operation, Strengthening Grid With Clean Power
The 72.5-megawatt Stelpe Solar Farm II, developed by Ignitis Renewables in Latvia, has officially reached commercial operation. Located in the southern Bauska municipality, the solar farm spans 85 hectares and […] The post Stelpe Solar Farm Reaches 145 MW Full Commercial Operation, Strengthening Grid With Clean Power appeared first on SolarQuarter.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium