Published 3 hours ago • loading... • Updated 3 hours ago
Solar Panels on the Roof Power the Adjacent Factory, and the Head Office Uses 100% Renewable Energy! Corcoat's Saitama No. 1 Factory Introduces Solar Power Generation Equipment and Converts the Head Office's Electricity Usage to Renewable Energy.
Colcoat has installed a 252.84kW solar power generation system at its Saitama No. 1 factory, which will begin operation on August 1, 2026. The head office will switch to 100% renewable energy from March 8, 2026, and aims to reduce total CO2 emissions by 63% by fiscal year 2035 (compared to fiscal year 2021).
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Colcoat has installed a 252.84kW solar power generation system at its Saitama No. 1 factory, which will begin operation on August 1, 2026. The head office will switch to 100% renewable energy from March 8, 2026, and aims to reduce total CO2 emissions by 63% by fiscal year 2035 (compared to fiscal year 2021).