Published • loading... • Updated
So Far Are the Construction Work on the Southern Bypass Pirna
2 Articles
2 Articles
Since 2017, the southern bypass in Pirna has been built. Local residents and tourists hope that work at the mega-building site above the Gottleuba Valley will soon end. We have asked about the current situation.
The Minister of Transport of the Sarajevo Canton, Adnan Šteta, and the Mayor of the Novo Sarajevo Municipality, Benjamina Karić, visited the construction site of the Southern Longitudinal today with the Director of the Sarajevo Canton Roads Directorate and representatives of the contractor. "The Southern Longitudinal is a major project, which will significantly contribute to the safety of all traffic participants and reduce congestion. A large n…
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
