SILVER ONE ANNOUNCES IN-GROUND MINERAL RESOURCE ESTIMATE PREPARED IN ACCORDANCE WITH NI 43-101 ON ITS CANDELARIA PROJECT, NEVADA
- Silver One Resources Inc. Announced the completion of an updated NI 43-101 mineral resource estimate for its Candelaria Project in Nevada on May 6, 2025.
- This update integrates comprehensive drilling data from both reverse circulation and core sampling programs, alongside metallurgical analyses, building upon the 2020 leach pad resource estimate and historical information from earlier operators.
- The total resources have surpassed previous historic figures, with the majority now categorized as Measured and Indicated, totaling over 108 million ounces silver equivalent, and the deposit remains open for further expansion in all directions.
- The Measured and Indicated pit-constrained resources include 22.07 million tonnes averaging 94 g/t silver and 0.20 g/t gold, and Silver One plans to resume drilling to expand near-surface and higher-grade underground targets.
- Silver One is carrying out a PEA study to evaluate cyanide versus alternative non-cyanide recovery methods, with preliminary results indicating that the innovative approach may enhance the extraction rates of silver and gold while also reducing processing expenses, suggesting promising development potential.
26 Articles
26 Articles

SILVER ONE ANNOUNCES IN-GROUND MINERAL RESOURCE ESTIMATE PREPARED IN ACCORDANCE WITH NI 43-101 ON ITS CANDELARIA PROJECT, NEVADA
VANCOUVER, BC, May 6, 2025 /PRNewswire/ -- Silver One Resources Inc. (TSXV: SVE) (OTCQX: SLVRF) (FSE: BRK1) ("Silver One" or the "Company") is pleased to announce the completion of a NI 43-101 mineral resource estimate ("MRE") for its Candelaria Project…
SILVER ONE ANNOUNCES IN-GROUND MINERAL RESOURCE ESTIMATE PREPARED IN ACCORDANCE WITH NI 43-101 ON ITS CANDELARIA PROJECT, NEVADA - PressReach
VANCOUVER, BC, May 6, 2025 /PRNewswire/ — Silver One Resources Inc. (TSXV: SVE) (OTCQX: SLVRF) (FSE: BRK1) (“Silver One” or the “Company”) is pleased to announce the completion of a NI 43-101 mineral resource estimate (“MRE”) for its Candelaria Project (the “Project”), located in Nevada, USA. The mineral resource estimate, prepared by James A. McCrea, P. Geo, includes the in-ground mineralization and stockpiles adjacent to the historic Mount Di…
Silver One Outlines 108.8 Million Ounces Silver Equivalent M&I At Candelaria In Updated Resource Estimate
Silver One Resources (TSXV: SVE) has released a mineral resource estimate for its Candelaria project in Nevada. The estimate is covers both in-ground mineralization, as well as low grade stockpiles that exist on site adjacent to historic open pits. In terms of in-ground mineralization, mineralization is constrained within open pit models at both the Mount […]
Sun Silver to begin phase 1 testwork at Maverick Springs
Sun Silver readies for Phase 1 metallurgical test work Previous fine particle cyanide leach tests achieved silver recoveries up to 97.5% with gold recoveries up to 95.8% Higher cyanide dosages have also previously been identified, significantly improving silver extraction efficiency Special Report: Phase 1 metallurgical testwork is set to begin at the Maverick Springs silver-gold asset in Nevada, US, to enhance recoveries and fine-tune proc…
Coverage Details
Bias Distribution
- 82% of the sources are Center
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage