Sheridan County Engineer pleased with Ranchester bridge results
Summary by sheridanmedia.com
1 Articles
1 Articles
All
Left
Center
Right
Sheridan County Engineer pleased with Ranchester bridge results
Sheridan County Engineer Ken Muller made an appearance on Sheridan Media’s Public Pulse and said the Ranchester Bridge replacement was a major project for the Wyoming Department of Transportation. Costing approximately $12.5 million, Muller said the project was not only needed but one he enjoyed being a part of as the bridge being replaced holds historical significance. K. Muller During the replacement project, crews discovered old coal cars th…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage