Published

Schrems: Work on Brownaubach Bridge completed.

Summary by meinbezirk.at
Work on the renovation of the Braunaubach Bridge in Schrems began at the end of April 2024. They have now been completed. SCHREMS. In the municipality of Schrems, a bridge crosses Braunau on the state road B2. It was built in 1968 as a reinforced concrete slab structure with a total span of around 135 meters. As part of the periodic bridge tests, time and weather damage was caused to the bridge equipment - i.e. road surface,...
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Sources are mostly out of (0)

You have read out of your 5 free daily articles.

Join us as a member to unlock exclusive access to diverse content.