Published 2 hours ago • loading... • Updated 2 hours ago
Rishikesh-Karnprayag railway line project for Char Dham connectivity boost hits 41 tunnel breakthroughs; RVNL completes 10.847-km Escape Tunnel 1, with 5 more expected within a year
The Rishikesh Project Implementation Unit of RVNL achieved the breakthrough on Friday after completing the full 10.847-km length of Escape Tunnel 1. The tunnel is the second-longest on the project.