Repair works on damaged 161Kv Aboagye-Tarkwa transmission line ongoing – Energy Ministry
3 Articles
3 Articles
Power Supply Threatened as GRIDCo Transmission Line Sustains Damage
News Ghana, Latest Updates and Breaking News of Ghana, News Ghana, https://www.newsghana.com.gh/power-supply-threatened-as-gridco-transmission-line-sustains-damage/Residents in Kumasi and Tarkwa face potential electricity disruptions after the Ministry of Energy and Green Transition confirmed damage to a critical transmission line on Wednesday, raising concerns about power stability in the Western and Ashanti Regions. The Ghana Grid Company Ltd.…
Aboadze-Tarkwa Transmission Line Suffers Disruption, Management Assures Swift Action
The Ministry of Energy and Green Transition has announced that the 161kV Aboadze–Tarkwa transmission line, operated by the Ghana Grid Company Ltd. (GRIDCo), has been disrupted. This critical infrastructure is responsible for transmitting power to parts of the Western and Ashanti Regions, including Kumasi and Tarkwa. According to the ministry, the maintenance team has been swiftly deployed and is currently at the location, working diligently to r…
Repair works on damaged 161Kv Aboagye-Tarkwa transmission line ongoing – Energy Ministry
The Ministry of Energy and Green Transition wishes to inform the public that Ghana Grid Company Ltd. (GRIDCo’s) 161kV Aboadze–Tarkwa transmission line has been damaged. A statement dated October 14 said, “The maintenance team has been swiftly deployed and is currently at the location, working diligently to repair the line as quickly as possible.” “The […]
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium

