Skip to main content
See every side of every news story
Published • loading... • Updated

Repair of Water and Sewage Systems in Absheron and Khirdalan Will Cost 4.2 Million Manat

Summary by Banker.az
4.2 million manats have been allocated to eliminate accidents in water systems in Absheron and Khirdalan. Banker.az reports that the “Regional Water Reclamation Service” LLC will take measures to eliminate emergency situations in drinking water, sewage and rainwater drainage systems in the Absheron region and the city of Khirdalan. For this purpose, the “Euro-Asian Construction Corporation” “EvrAscon” OJSC has allocated 4 million 195 thousand ma…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

4.2 million manats have been allocated to eliminate accidents in water systems in Absheron and Khirdalan. Banker.az reports that the “Regional Water Reclamation Service” LLC will take measures to eliminate emergency situations in drinking water, sewage and rainwater drainage systems in the Absheron region and the city of Khirdalan. For this purpose, the “Euro-Asian Construction Corporation” “EvrAscon” OJSC has allocated 4 million 195 thousand ma…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Banker.az broke the news on Wednesday, October 28, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal