Skip to main content
See every side of every news story
Published loading...Updated

Iberdrola Launches 195MW Tâmega Norte Wind Farm in Portugal

Iberdrola has commissioned the 195MW Tâmega Norte wind farm, situated between Braga and Vila Real in Portugal's Cabeceiras de Basto and Montalegre municipalities.

8 Articles

Lean Right

The first wind-hydro project in Portugal, in Vila Real district, already has some wind turbines to produce energy, and the others will come into operation in the coming weeks.

·Portugal
Read Full Article
Right

Iberdrola has begun the start-up of the wind farm Tâmega Norte, the first of the two that make up the wind-hydraulic megaproject of the Tâmega Complex, located between Braga and Vila Real, in the north of Portugal. The complex is the first wind-hydraulic hybrid development connected to the network in the Iberian Peninsula, thus consolidating the company’s continued commitment to renewable energies. The megaproject of the Tâmega consists of two w…

Iberdrola has begun energizing the Tâmega Norte Wind Farm, a project combining wind and hydropower that is considered "pioneering" and operates in connection with the dams of the Tâmega Hydroelectric System (SET). The Tâmega Norte Wind Farm was built between Salto (Montalegre) and Cabeceiras de Basto and is connected to the Tâmega Sul Wind Farm, which is being installed between Ribeira de Pena and Vila Pouca de Aguiar. Iberdrola announced today,…

Iberdrola started the energyization of the North Thames Wind Park where it combines wind and water energy, in a project considered "pioneer" that works in connection with the dams of the Thames Electroproducer System (SET).

·Portugal
Read Full Article

Iberdrola started the energyization of the North Thames Wind Park where it combines wind and water energy, in a project considered "pioneer" that works in connection with the dams of the Thames Electroproducer System (SET).

·Portugal
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

OKDIARIO broke the news on Thursday, May 14, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal