Plenitude announces the beginning of the production of its Villarino photovoltaic plant, located in the municipality of Villarino de los Aires, in Salamanca (Castilla y León, Spain), with an installed power of 220 MW. The start of operation took place in the presence of the CEO of Plenitude, Stefano Goberti, and the CEO of Plenitude Renovables Spain, Mariangiola Mollicone. The project, consisting of a single solar park, which extends over 286 he…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Plenitude announces the beginning of the production of its Villarino photovoltaic plant, located in the municipality of Villarino de los Aires, in Salamanca (Castilla y León, Spain), with an installed power of 220 MW. The start of operation took place in the presence of the CEO of Plenitude, Stefano Goberti, and the CEO of Plenitude Renovables Spain, Mariangiola Mollicone. The project, consisting of a single solar park, which extends over 286 he…