Skip to main content
See every side of every news story
Published • loading... • Updated

Peruvian Cement Industry Opens First Photovoltaic Self-Consumption Plant

The installation of Cemento Yura, located in Arequipa, an installed power of 28 MWp, will cover about 30% of the energy demand of the cement plant, part of the decarbonization strategy of the company by 2050. Cemento Yura, of Grupo Gloria, started its first photovoltaic plant of autoconsumption in Peru, with an installed power of 28 MWp and an investment of over 23.5 million dollars. The plant, located in a property of 45 hectares in Arequipa, h…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

The installation of Cemento Yura, located in Arequipa, an installed power of 28 MWp, will cover about 30% of the energy demand of the cement plant, part of the decarbonization strategy of the company by 2050. Cemento Yura, of Grupo Gloria, started its first photovoltaic plant of autoconsumption in Peru, with an installed power of 28 MWp and an investment of over 23.5 million dollars. The plant, located in a property of 45 hectares in Arequipa, h…

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

pv-magazine-latam.com broke the news on Monday, May 19, 2025.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal