Skip to main content
See every side of every news story
Published loading...Updated

Penstock failure shuts down Yuba River hydropower plant

DOBBINS — A catastrophic failure Friday afternoon of a newly constructed penstock pipe at the New Colgate Powerhouse on the north and middle forks of the Yuba River has shut down hydroelectric operations, the Yuba Water Agency reported. The event is downstream from New Bullards Bar Dam and did not impact the integrity of the dam, Yuba Water Agency General Manager Willie Whittlesey said. “The dam is safe,” he said. All water agency staff and cont…

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

YubaNet broke the news in on Saturday, February 14, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal