Published • loading... • Updated
Pedestrian detours in place as Newtown-Belmont river crossing closes for repairs
Summary by Times News Group
1 Articles
1 Articles
Pedestrian detours in place as Newtown-Belmont river crossing closes for repairs
A POPULAR pedestrian bridge and river crossing connecting Newtown and Belmont will close for five months from May to allow for a major infrastructure upgrade. The Macintyre Bridge is expected to remain out of service until late September while crews perform a major overhaul of the sewer main that transfers waste across the Barwon River. The project involves relining the pipe and installing new safety panelling along the concrete walkway to ensur…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium