Published • loading... • Updated
Operator anticipates 1700 extra truck movements during upcoming rail closure
Summary by Big Rigs
1 Articles
1 Articles
Operator anticipates 1700 extra truck movements during upcoming rail closure
The Shepparton Line will be closed to install, commission and test the line’s new signalling system. Image: Victoria’s Big Build A major construction industry supplier says an upcoming 45-day shutdown of the Shepparton rail line will have a major impact on how it goes about moving its freight. Heidelberg Materials Australia will need to make approximately 1700 truck trips – up to 40 trucks for each day the rail line is closed. The company reveal…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium