The sixth power unit of the Novovoronezh nuclear power plant has been disabled by automaticity, reporting to the nuclear power station ' s communications department.
The sixth power unit of the Novovoronezh nuclear power plant was temporarily taken out of service for the repair of thermal mechanical equipment, the shutdown took place in a safe manner, reported to the Communications Authority of the nuclear power plant. The power unit was permanently disabled from the network by automatic means, transferred to TASS. The reason was the need to repair the thermal mechanical equipment. "On September 24, 2026, at…
The sixth power unit of the Novovoronezh nuclear power plant has been disabled by automaticity, reporting to the nuclear power station ' s communications department.