New US$2.3 Million Boat Built To Remove Water Hyacinth Abndoned In Lampang
1 Articles
1 Articles
New US$2.3 Million Boat Built To Remove Water Hyacinth Abndoned In Lampang
Lampang – A prototype boat designed to collect water hyacinth at Kiew Lom Dam, worth nearly US$2.3 million, now lies unused and sunken in the mud. Despite being completed and staff being trained in 2023, it was never put to real use. Local residents say the boat has been left untouched since its trial run. […] The post New US$2.3 Million Boat Built to Remove Water Hyacinth Abndoned in Lampang first appeared on CTN News-Chiang Rai Times.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage