Months after floodwaters severely damaged the Farm to Market Bridge in Libby, construction is scheduled to begin on a full replacement of the crossing.In December 2025, Libby Creek flooded and severely damaged the Farm to Market Bridge at mile marker 2.6 on Secondary Highway 482. The loss of the bridge has disrupted daily life for residents in the area.(WATCH: Montana moves forward with $4.7M replacement of Libby bridge after flooding) Montana m…