Skip to main content
See every side of every news story
Published loading...Updated

Montana moves forward with $4.7M replacement of Libby's Farm to Market Bridge after December flooding

The $4.7 million project will replace the crossing with a longer, wider span designed to withstand future flooding, officials said.

Summary by KXLF
Months after floodwaters severely damaged the Farm to Market Bridge in Libby, construction is scheduled to begin on a full replacement of the crossing.In December 2025, Libby Creek flooded and severely damaged the Farm to Market Bridge at mile marker 2.6 on Secondary Highway 482. The loss of the bridge has disrupted daily life for residents in the area.(WATCH: Montana moves forward with $4.7M replacement of Libby bridge after flooding) Montana m…

6 Articles

KTVHKTVH
+5 Reposted by 5 other sources
Center

Montana moves forward with $4.7M replacement of Libby's Farm to Market Bridge after December flooding

Montana's Department of Transportation awarded a $4.7M contract to replace Libby's flood-damaged Farm to Market Bridge, with completion expected in early 2027

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

KBZK broke the news on Sunday, July 19, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal