Skip to main content
See every side of every news story
Published • loading... • Updated

Thissio - Moschato with the First Reconstructed ISAP Train and K. Mitsotakis as a Passenger

Summary by in.gr
Kyriakos Mitsotakis had the opportunity to review the route with the first reconstructed train of the Electric Railway (Line 1), which was put into service last week, at noon. “The situation is problematic, due to extremely old trains.” The post Line 1: Thissio – Moschato with the first reconstructed train of ISAP and K. Mitsotakis as a passenger appeared first on in.gr.

19 Articles

Lean Left

Kyriakos Mitsotakis had the opportunity to review the route with the first reconstructed train of the Electric Railway (Line 1), which was put into service last week, at noon. “The situation is problematic, due to extremely old trains.” The post Line 1: Thissio – Moschato with the first reconstructed train of ISAP and K. Mitsotakis as a passenger appeared first on in.gr.

·Greece
Read Full Article
Right

"In 2027, the reconstruction and modernization of another 14 trains will take place," he said.

·Marousi, Greece
Read Full Article
Lean Right

Prime Minister Kyriakos Mitsotakis boarded the Elektrikos train, which was put into service last week. The Prime Minister, accompanied by the Deputy Minister of Transport, George Kotsyras, and the CEO of STASI, Thanasis Kottaras, boarded the first of a total of 14 trains that will be completely rebuilt and modernized, following the route from Thiseio station to Moschato. The rebuilt trains have improved accessibility, including for the safe tran…

This particular train began its journeys last week, marking the beginning of the gradual renewal of the Line 1 fleet, after 22 years without the addition of new rolling stock.

Read Full Article

Kyriakos Mitsotakis boarded the first of a total of 14 Electric Railway trains that will be fully reconstructed and modernized, following the route from Thissiion station to Moschato on Line 1. The train on which the Prime Minister boarded was put into circulation last week, while the rest will be received, as he stated, […] The article Kyriakos Mitsotakis: Followed the route of Line 1 – “14 fully reconstructed ISAP trains in 2027” appeared firs…

Kyriakos Mitsotakis boarded the first of a total of 14 Electric Railway trains that will be fully reconstructed and modernized, following the route from Thission station to Moschato...More...

·Greece
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 67% of the sources lean Right
67% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Business Daily broke the news on Monday, October 12, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal