Skip to main content
See every side of every news story
Published • loading... • Updated

Tempo 50 Remains on Mattersburger Straße

Summary by Kronen Zeitung
After the three-month pilot test, the results of the test run are to be incorporated into the planning for the future design of the road in Eisenstadt.

2 Articles

Right

After the three-month pilot test, the results of the test run are to be incorporated into the planning for the future design of the road in Eisenstadt.

·Vienna, Austria
Read Full Article

The three-month pilot operation on Mattersburger Straße in Eisenstadt ends. Land Burgenland, the city of Eisenstadt and the Kuratorium für Verkehrssicherheit (KFV) are satisfied with the results. EISENSTADT. The three-month pilot operation on Mattersburger Straße in Eisenstadt ends with 17 November. According to the state of Burgenland and the city of Eisenstadt, the daily traffic volume of around 13,000 vehicles could be reduced to one lane per…

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Right
100% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

meinbezirk.at broke the news on Monday, November 16, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal