Longueuil: the eco-responsible approach of the South Shore Moisson Carrefour
Summary by La Relève
1 Articles
1 Articles
All
Left
Center
Right
The building housing the new Carrefour Moisson Rive-Sud, which maximizes food aid in Montérégie in an eco-responsible approach, opened its doors on December 12, nine months after the launch of the construction project. Located in Saint-Hubert, the warehouse is equipped with LED lighting and its refrigerated areas have energy-efficient doors. The designed white roof limits the heat islands and asphalt surfaces have been reduced to promote soil pe…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium