Skip to main content
See every side of every news story
Published • loading... • Updated

Subsoil Reinforcement Works Have Begun in Kypseli Due to the Metro - Concrete Injections on Spetson Street

Summary by in.gr
The drilling and injection in Kypseli have already exceeded the depth where the fiber optic networks pass, reaching even lower, below the level of the water pipes The post Kypseli: Subsoil reinforcement works have begun due to the Metro – Concrete injections on Spetson Street appeared first on in.gr.

6 Articles

Lean Left

The drilling and injection in Kypseli have already exceeded the depth where the fiber optic networks pass, reaching even lower, below the level of the water pipes The post Kypseli: Subsoil reinforcement works have begun due to the Metro – Concrete injections on Spetson Street appeared first on in.gr.

·Greece
Read Full Article
Lean Right

Concrete and cement works are in full swing on Spetson Street, in Kypseli, to reinforce the subsoil and support the structures that have suffered damage from the Metro Line 4 works. ​This particular section of the road remains closed, as specialized crews initially investigate for any cuts in utility networks and proceed with targeted concrete "injections" at various points, depths and slopes. According to information, the drilling and injection…

Read Full Article

Specialized crews are pouring concrete under EYDAP's networks to eliminate the danger, at a time when residents' anxiety is at its peak.

Read Full Article

These are urgent interventions to eliminate the danger and not to permanently repair the damage. Works with concrete and cement are in full swing on Spetson Street, in Kypseli, to reinforce the subsoil and support the structures that have suffered damage from the works of Metro Line 4. This particular section of the road remains closed, as specialized crews initially investigate for any cuts in utility networks and proceed with targeted "injecti…

Read Full Article

Concrete and cement works are in full swing on Spetson Street, in Kypseli, to reinforce the subsoil and support the...

Read Full Article

Concrete and cement works are in full swing on Spetson Street, in Kypseli, to reinforce the subsoil and support the structures that were damaged by the Metro Line 4 works. This section of the road remains closed, as specialized crews are initially investigating for any cuts in utility networks and […] The article Kypseli: Concrete “injections” in full swing on Spetson Street to reinforce the subsoil – Continuous monitoring for further displaceme…

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left, 50% of the sources lean Right
50% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Ελεύθερος Τύπος broke the news on Wednesday, November 18, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal