Published 1 day ago • loading... • Updated 1 day ago
JR Central Plans to Compensate for 30 Years' Worth of Maintenance Costs for Replacement Wells, etc., Due to the Drop in Well Water Levels Caused by the Linear Motor Train Construction
JR Tokai announced on the 14th that it will compensate residents for 30 years' worth of maintenance costs for a replacement well in response to a problem of low well water levels near the construction site of the Chuo Shinkansen maglev tunnel in Mizunami City, Gifu Prefecture. In Okumachi, Mizunami City, the maglev tunnel excavation work has caused a drop in well water levels and ground subsidence, leading to a temporary suspension of constructi…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
JR Tokai announced on the 14th that it will compensate residents for 30 years' worth of maintenance costs for a replacement well in response to a problem of low well water levels near the construction site of the Chuo Shinkansen maglev tunnel in Mizunami City, Gifu Prefecture. In Okumachi, Mizunami City, the maglev tunnel excavation work has caused a drop in well water levels and ground subsidence, leading to a temporary suspension of constructi…