Skip to main content
See every side of every news story
Published • loading... • Updated

It's Been Talked About Since 1990, and Construction Has Just Begun. A Third Bridge Is Being Built on the Dunajec River, Costing 242 Million Złoty.

Construction of the third bridge over the Dunajec River has begun in Nowy Sącz. The new 526-meter-long crossing will form part of a road connection over three kilometers long. The project also includes smaller structures that will transform the architecture of this part of the city. The investment is valued at nearly PLN 242 million.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

2 Articles

The long-awaited construction of the so-called third bridge over the Dunajec River has begun in Nowy Sącz. The project is expected to ease traffic congestion in the region and significantly improve communication. The first disruptions for drivers have already occurred.

Read Full Article

Construction of the third bridge over the Dunajec River has begun in Nowy Sącz. The new 526-meter-long crossing will form part of a road connection over three kilometers long. The project also includes smaller structures that will transform the architecture of this part of the city. The investment is valued at nearly PLN 242 million.

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

propertydesign.pl broke the news on Saturday, November 21, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal