The hydroelectric dam carries out technical maneuvers to control the volume of the reservoir against the forecasts of intense rains in the region. The complex released 11 million liters of water per second simultaneously.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Itaipu Binacional reported that on Friday they opened the central channel of the landfill, which had been closed on October 23. The left channel remains open and the total flow through both channels is 11 million liters of water per second.
The hydroelectric dam carries out technical maneuvers to control the volume of the reservoir against the forecasts of intense rains in the region. The complex released 11 million liters of water per second simultaneously.