The system connects to the San Andrés solar plant, in the Atacama region, and joins the BESS San Andrés I, of 35 MW / 175 MWh. Together, both assets reach 77 MW / 385 MWh of storage. The Canadian company Innergex Renewable Energy has announced the commissioning of the storage system in batteries BESS San Andrés II, of 42 MW / 210 MWh, located in the Atacama region, in Chile. The project is already energized and integrated to the National Electri…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The system connects to the San Andrés solar plant, in the Atacama region, and joins the BESS San Andrés I, of 35 MW / 175 MWh. Together, both assets reach 77 MW / 385 MWh of storage. The Canadian company Innergex Renewable Energy has announced the commissioning of the storage system in batteries BESS San Andrés II, of 42 MW / 210 MWh, located in the Atacama region, in Chile. The project is already energized and integrated to the National Electri…