Hyperion's Power Plant in Abrantes Is Already Producing Energy
2 Articles
2 Articles
The Hyperion Renewables photovoltaic power plant, located in Arreciadas, in the municipality of Abrantes, began operation in October. The project occupies 53 hectares, comprises about 35,000 solar panels and has an estimated annual production equivalent to the consumption of 20,000 homes.
Hyperion Renewables announced today that its photovoltaic power plant in Arreciadas, Abrantes, has been connected to the electricity grid and in full operation since October, with estimated annual production equivalent to the consumption of 20,000 homes.The photovoltaic power plant of Hyperion Renewables, in Abrantes, is connected to the electricity grid and is in full operation since October [...] Hyperion's Central Photovoltaic content in Abra…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium


