Skip to main content
See every side of every news story
Published • loading... • Updated

How Lincoln cut $34M from its Deadmans Run flood control project

The project would add a detention basin and widen the creek to lower flood risk for homes near North 33rd Street.

Lincoln found a way to cut $34 million from its Deadmans Run flood project without sacrificing its goal: removing 480 properties from the 100-year floodplain.

4 Articles

Star-HeraldStar-Herald
+3 Reposted by 3 other sources
Center

How Lincoln cut $34M from its Deadmans Run flood control project

Lincoln found a way to cut $34 million from its Deadmans Run flood project without sacrificing its goal: removing 480 properties from the 100-year floodplain.

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources are Center
100% Center

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

Lincoln Journal Star broke the news in Cherokee County, United States on Sunday, November 22, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal