ExxonMobil Starts Uaru Production, Lifting Guyana Capacity to 1.1 MMbpd
7 Articles
7 Articles
5th oil project starts production
…Guyana’s daily capacity to reach 1.1M barrels per day by 2027 (Kaieteur News) – The Ministry of Natural Resources (MNR) on Monday announced the startup of Guyana’s fifth oil project, Uaru which will eventually push the country’s daily capacity beyond one million barrels per day. In a statement, the ministry said the Errea Wittu Floating Production, […]
Guyana’s 5th FPSO starts production, to lift capacity to 1.15M barrels per day
Guyana’s offshore oil production capacity is set to increase to about 1.15 million barrels per day following the commencement of production from the Errea Wittu Floating Production, Storage and Offloading (FPSO) vessel, the country’s fifth production vessel in the Stabroek Block. ExxonMobil Guyana and the Natural Resources Ministry announced on Monday that the vessel had […]
Guyana’s 5th FPSO hits first oil See full statement from the Ministry of Natural Resources:
The Government of Guyana is pleased to announce the achievement of first oil from the Errea Wittu Floating Production, Storage and Offloading (FPSO) vessel. This marks the start-up of the Uaru Development, the fifth offshore development in the Stabroek Block. Errea Wittu, a Warrau word meaning “abundance,” will produce oil under the Uaru Petroleum Production […]
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium








