According to information from Le Droit, two recently built libraries would present significant problems. The Donalda-Charron Library, inaugurated in 2020, would have faults related to its heating, ventilation and air conditioning system. It could require significant corrective work. The City of Gatineau decided to bring the case before the courts. At the Lucy-Faris Library, inaugurated in April 2026, water would have been infiltrated into the bu…