Published • loading... • Updated
First Atlantic Nickel Expands Phase 2X Drilling at Pipestone XL Nickel Alloy Project: Four Additional Holes Targeting 1.4 Kilometer Strike Length and 850-Meter Width at RPM Zone
Summary by Financial Post
1 Articles
1 Articles
First Atlantic Nickel Expands Phase 2X Drilling at Pipestone XL Nickel Alloy Project: Four Additional Holes Targeting 1.4 Kilometer Strike Length and 850-Meter Width at RPM Zone
All Ten Discovery Holes at the RPM Zone Return Positive Magnetically Recoverable Nickel; New Expansion Drilling to Test Eastern, Northern, and Southern Extensions of Awaruite Mineralization
·Canada
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right1Center0Last UpdatedBias Distribution100% Right
Bias Distribution
- 100% of the sources lean Right
100% Right
R 100%
Factuality
To view factuality data please Upgrade to Premium
