Published • loading... • Updated
Europe’s largest-diameter vertical shaft sinking machine starts excavating for National Grid
Summary by New Civil Engineer
1 Articles
1 Articles
Europe’s largest-diameter vertical shaft sinking machine starts excavating for National Grid
A 15m-diameter vertical shaft sinking machine (VSM) has begun excavation work at National Grid’s Tilbury site as part of a project to replace a 1960s cable tunnel under the Thames between Tilbury and Gravesend. The post Europe’s largest-diameter vertical shaft sinking machine starts excavating for National Grid appeared first on New Civil Engineer.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium