Engie Energizes a Hybrid Battery with a Photovoltaic Park on the Base of Atacama (Chile)
3 Articles
3 Articles
The system of 46 MW and 230 MWh begins its pre-commercial phase. It is part of a broader strategy of the company in Chile, in which stand out BESS Arica (30 MW), BESS Lile (140 MW), BESS Kallpa (57 MW) and the hybrid development Libéllula, which will combine solar generation with storage.Engie Chile has completed the energization of the storage system BESS Los Loros, located in the Los Loros Photovoltaic Park, in the commune of Tierra Amarilla (…
Marking a new advance in the development of key infrastructure for the integration of renewable energies in the country, Engie Chile completed the energyization of BESS Los Loros, its energy storage system located in Los Loros Photovoltaic Park, in the municipality of Tierra Amarilla, Atacama Region. With 46 MW of installed power and 230 MWh of storage capacity, the system will allow to save energy generated by the solar park during the day to i…
Engie Chile reported that it completed the energyization of BESS Los Loros, its energy storage system located in Los Loros Photovoltaic Park, in the municipality of Tierra Amarilla, Atacama Region. With 46 MW of installed power and 230 MWh of storage capacity, the system will save energy generated by the solar park during the day to inject it into the electrical system at times of greater demand. After completing its energyization, the initiativ…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium