Published • loading... • Updated
Energean restarts production in Adriatic - Drilling Contractor
Summary by Drilling Contractor
1 Articles
1 Articles
Energean restarts production in Adriatic - Drilling Contractor
Energean restarted production activities on 12 October at the Rospo Mare Field, located 20 km off the coast of Termoli and Vasto. The Rospo Mare Field has been shut down since January 2025. Its current production capacity exceeds 2,000 barrels per day, with expected remaining production life until beyond 2040. Full production is expected to … The post Energean restarts production in Adriatic appeared first on Drilling Contractor.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
