20 Kilometres of Traffic Jam in Front of the Gotthard-Nordportal
17 Articles
17 Articles
On the weekend there was the biggest holiday wave in the south. In front of the north portal of the motorway tunnel, the vehicles stowed up to 20 kilometers on Saturday. Even longer columns could happen in two weeks.
Those who want to pass the Swiss Alps towards the south need a lot of patience. At an important traffic junction there is traffic jam.
A construction site in the tunnel and the usual holiday rush: At the Gotthard tunnel in Switzerland, it is once again staggering. Travellers have to expect an unplanned break of three hours. However, the mood is not yet irritable.
There is a twenty-kilometer traffic jam at the Swiss Gotthard Tunnel. According to the mobility organization Touring Club Suisse (TCS), this amounts to a waiting time of three hours and twenty minutes.
The traffic jam in front of the Gotthard-Nordportal in the direction of the south reached a length of 20 kilometers on Saturday morning at already after 8 o'clock. This corresponds to a waiting time of three hours and 20 minutes, as the TCS reported.
In front of the Gotthard-Nordportal the traffic is staggered at 11 kilometers. The waiting time is one hour and 30 minutes.
Coverage Details
Bias Distribution
- 50% of the sources lean Left, 50% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium









