Published • loading... • Updated
Drilling for New Temporary Bridge: B172 in Bad Schandau Closed at the End of November
Summary by mdr.de
1 Articles
1 Articles
Drivers in Bad Schandau have to adjust again to longer driving times at the end of November. Reason is a multi-day full lock of the B172. Drilling is necessary for the planned temporary bridge on the railway line.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
