A New Expressway Is Being Planned in Croatia
6 Articles
6 Articles
The new route of a planned expressway connecting Dubrovnik with the city's Ruđer Bošković Airport has been unveiled. The next step in the project is to prepare an environmental impact assessment, Croatia Week reported.
The President of the Board of Croatian Roads, Ivica Budimir, pointed out at the presentation that the proposed route is in accordance with valid spatial planning documentation.
The solution for the future expressway from Dubrovnik to the airport in Čilipi, 33 kilometers long, or a total of 48 kilometers with connecting roads, with 11 tunnels and 11 viaducts, was presented on Friday in Dubrovnik. The value of the investment is estimated at around 350 million euros. The President of the Management Board of Croatian Roads Ivica Budimir pointed out at the presentation that the proposed […] The post The solution for the exp…
The solution for the future expressway from Dubrovnik to Čilipi was presented on Friday, and the investment of 350 million euros should enable a reduction in traffic through Župa dubrovačka and a connection to future highways.
"The strategy of the Republic of Croatia is not for this road to serve transit traffic to Greece. According to the plan, at the Osojnik junction, a connection to Popova polje and a connection to the future highway that will lead through Bosnia and Herzegovina to Montenegro is planned," explained Budimir.
The solution for the future expressway from Dubrovnik to the airport in Čilipi, 33 kilometers long, or a total of 48 kilometers with connecting roads, with 11 tunnels and 11 viaducts, was presented on Friday in Dubrovnik. The investment value is estimated at around 350 million euros, and construction could take at least ten years. The President of the Board of Croatian Roads Ivica […] The post Croatia embarks on a transport megaproject: A 350 mi…
Coverage Details
Bias Distribution
- 100% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium






