Skip to main content
See every side of every news story
Published • loading... • Updated

Power Engineers Near Dukovany Used Triple Coating for the First Time in the Czech Republic when Plowing Cables

Summary by Novinky.cz
In the field near the Dukovany nuclear power plant in the Třebíč region, unusual machines have been attracting attention in recent days. Power engineers are laying three high-voltage lines simultaneously in one pass using a plowing rig. The EG.D company is modernizing power lines for the first time in the Czech Republic.

2 Articles

Lean Left

In the field near the Dukovany nuclear power plant in the Třebíč region, unusual machines have been attracting attention in recent days. Power engineers are laying three high-voltage lines simultaneously in one pass using a plowing rig. The EG.D company is modernizing power lines for the first time in the Czech Republic.

A special plow, deployed by EG.D, a company from the E.ON group, at Dukovany, can lay three high-voltage cables into the ground at once. The distributor is using the so-called triple-lay for the first time in the Czech Republic. The technology is designed to significantly speed up the work – under ideal conditions, it can lay up to 1,500 meters of lines per day.

·Čestlice, Czechia
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 100% of the sources lean Left
100% Left

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

iDNES.cz broke the news in Čestlice, Czechia on Thursday, October 8, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal