Connecticut transportation officials are delaying a major traffic shift on I-95 at the Gold Star Bridge. The planned crossover in New London is now scheduled for May 30. The Connecticut Department of Transportation said the change, originally scheduled for this weekend, is being postponed to “minimize disruptions” during the busy Memorial Day travel period. “Work is continuing in preparation for the traffic crossover,” CTDOT said. “That includes…