Published • loading... • Updated
Completes the Repair of the 24 Inch Pipe Fault in the Municipality of Baruta
Summary by focoinformativo.site
1 Articles
1 Articles
The councillor of the municipality Baruta Luis Aguilar reported this Saturday that the crews of Hidrocapital have already repaired the 24 inch pipeline located in Alto Prado, which affected the water supply in that area, El Peñón and Terrazas of the Club Hípico. Through social networks, Aguilar indicated that the pumping has already been activated [...] The entrance Finishes the repair of the 24 inch pipe failure in the municipality Baruta was f…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium