City of Pullman Awaits Assessment of Downtown Pedestrian Bridge After Flood Shifts Span Off Abutments
Summary by Dailyfly - Lewis Clark Valley News
1 Articles
1 Articles
City of Pullman Awaits Assessment of Downtown Pedestrian Bridge After Flood Shifts Span Off Abutments
Pine Street Plaza Pedestrian Bridge Downtown Pullman During Flooding Monday Morning PULLMAN, WA – City of Pullman engineers are waiting to assess the downtown pedestrian bridge after it floated of its footings during Sunday’s flood. The bridge is designed to float when the South Fork of the Palouse River gets high enough. The design includes a hinge on the North bank to allow the span to float and swing to the riverside. The feature is intende…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium