Published • loading... • Updated
Chhattisgarh’s first 15 MW floating solar plant commissioned at SAIL-BSP reservoir
Summary by newsriveting.com
1 Articles
1 Articles
Chhattisgarh’s first 15 MW floating solar plant commissioned at SAIL-BSP reservoir
Floating Solar Plant at Maroda Reservoir Team News Riveting Raipur, September 23 Joint collaboration of SAIL and NTPC, the 15-Mega-Watt capacity Floating Solar Plant commissioned by the NSPCL, at Maroda-1 Reservoir of SAIL-Bhilai Steel Plant, was inaugurated on Tuesday, marking a historic milestone as the first floating solar power project in Chhattisgarh. Chitta Ranjan Mohapatra, Director I/c (SAIL-BSP), along with Dr Ashok Kumar Panda, Directo…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium